PROJECT SARA MARTIN | PHOTOGRAPHY TARA CHATTELL & SARA MARTIN
Keep wet boots off the floor and organized with this easy wall-mounted boot rack. It holds up to five pairs of boots while they dry, making it a practical addition to any mudroom, garage or entryway.
TOOLS & MATERIALS
One 3-foot pine board (cut from a 2 × 10)
One 8-foot length of MDF reeded moulding
10 feet of 1-inch wood dowel, cut into eleven 10-inch lengths
Drill
1-inch spade drill bit
Jigsaw with a fine-tooth blade
Construction adhesive
Hammer
Pencil
Fine-grit sandpaper
Tape measure
Robertson screwdriver or drill/driver
Eleven 1-inch wood screws
Two 3½-inch wood screws
1-inch finishing nails
Paint
INSTRUCTIONS
1. CUT BACKER BOARD & MOULDING. Have the lumber yard cut a 3-foot piece from a 2 x 10 pine board. Using a jigsaw, cut the reeded moulding into 10-inch pieces. Cut one piece first and use it as a template for the remaining pieces.
2. ATTACH THE MOULDING. Arrange the reeded moulding pieces across the face of the pine board, leaving approximately a ¹∕8-inch overhang on all sides. If needed, trim the width of one moulding piece to achieve an even fit. For the least noticeable seam, cut between two of the reeds. Apply construction adhesive to the face of the pine board and press the moulding pieces into place, maintaining an even overhang on all sides. Secure each piece with 1-inch finishing nails, driving the nails between the reeds so they are hidden.
3. MARK & DRILL DOWEL HOLES. Find and mark the centre of the board. From the centre mark, measure out in 3½-inch increments to create five evenly spaced marks on each side, for a total of 11 marks. Using a drill fitted with a 1-inch spade bit, drill at each marked location until the tip of the bit just breaks through the back of the board. This creates a guide for securing the dowels later.
4. INSTALL THE DOWELS. Cut the 1-inch dowel into 11, 10-inch lengths and sand the cut ends smooth. Apply construction adhesive to one end of each dowel and insert it into the drilled holes. Allow the adhesive to cure according to the manufacturer’s instructions.
5. REINFORCE THE DOWELS. Turn the rack over. Drive one 1-inch wood screw into the back of the board and into each dowel, positioning the screw slightly off-centre from the pilot hole left by the spade bit. This reinforces each dowel for added strength.
6. FINISH THE RACK. Fill any visible nail holes, sand lightly and paint the rack. For the version shown, Benjamin Moore Thicket was used.
7. MOUNT THE RACK. Locate two wall studs and centre the rack over them. Fasten the rack to the studs using two 3½-inch wood screws, driving one near the top and one near the bottom through the pine backer. The screws can be concealed behind the slight overhang of the moulding for a clean, finished appearance. Your finished rack will hold up to five pairs of boots, keeping them organized and allowing them to dry efficiently. OH